Automatic block signalling and plough: what they have in common

  1. Step 1. Automatic block signalling — has part — Railway semaphore. Signals.
  2. Step 2. Railway semaphore — uses — Lever. The semaphore is set by a lever.
  3. Step 3. Lever — is used in — Hoe. The handle works as a lever when loosening soil.
  4. Step 4. Hoe — evolved into — Plough. The plough mechanized loosening the soil with a hoe.

Open Evothings