Electric bell and oil well: what they have in common
- Step 1. Electric bell — has part — Electromagnet. An electromagnet strikes a small hammer.
- Step 2. Electromagnet — is part of — Bubble chamber. The field bends the tracks.
- Step 3. Bubble chamber — has part — Piston. It releases pressure.
- Step 4. Piston — is part of — Diesel engine. Pistons move in the cylinders.
- Step 5. Diesel engine — is part of — Drilling rig. The drive.
- Step 6. Drilling rig — is used in — Oil well. A well is drilled by a rig.